Electric Side Steps-Power Running Boards Factory|YTPIONEER Focusing On Retractable Running Boards 20 Years

Chengdu Yongtuo Pioneer Technology co. LTD

Telephone:0086-17323076579 E-mail:grace@bravepioneer.cn

Cellphone / Wechat / Whatsapp / Skype:0086-17323076579

Home > Product Categories > BMW > BMW X7 > BMW X7 Electric Running Board

Installation Result Show

Installation Result Show

Product Installation Process

Product Installation Process

BMW X7 Electric Running Board

Source: Model list power side steps Author: YTPIONEER SVisit: 5123

Car Model:BMW X7 (2019 2020 2021)

Working Temperature:-40~80

Waterproof Grade: Motor IP68

Unit Price: 350-500.USD

Quality Assurance: 3 Years

Package Size: 197mm*40mm*34mm

Product Weight: 42KG

Lead Time: 1-10sets/2days 10-20set/3days consult for over 30 sets

share

Product details

1. Product Description

Two-year Warranty  Automatic Powerstep Power Running Boards Electric Side Step  For BMW X7

BMW has many car models fitting electric side steps, such as BMW X3,BMW X4,BMW X5,BMW X6,BMW X7 2019 2020 etc. We have products for the above models in stock covering most model years, ready to ship service is available. When you choose an electric side steps for a BMW car,  the exclusive ones developed by the original car mold-opening products are the best choice. All the electric running boards developed by our company adopt the sixth generation design, free of punching, free of wire-clip installation, good installation effect, perfect gap between the step panel and the skirt. The details are as follows:

BMW X7 Electric Running Board

BMW X7 Running Board Installation Show Results

BMW X7 Electric Running BoardBMW X7 Electric Running BoardBMW X7 Electric Running Board

BMW X7 Parts Picture

BMW X7 Electric Running Board

2. Core Technology

The motor of the power side step is its core component, and the life of the motor also determines the service life of the electric side step. YTPIONEER electric side step motors adopt the most advanced motors in China, which can ensure that the running sound of the motor is within 40 decibels, and the motor works normally at -40~+80 degrees Celsius. The panel production process determines its service life and aesthetics. The panels produced by our company all adopt three production processes and the panel does not change color after 10 years of use, and does not drop paint. The step’s bracket determines its weight-bearing performance Our brackets use laser cutting, and the welding are done by technicians who have at least 5 years of work experiences to ensure product quality. The new 6th generation design: the control box is placed inside the car, the integrated bracket, and the hidden bracket design ensures the electric side step installation effect to be satisfying.

Power Running Boards Motor

BMW X7 Electric Running Board

 Running Boards Panel Production

BMW X7 Electric Running Board

Running Boards Bracket Production

BMW X7 Electric Running Board

 Power Running Boards ECU Comparison

BMW X7 Electric Running Board

BMW X7 Power Running Boards ECU

BMW X7 Electric Running Board

BMW X7 Power Running Boards Brackets

BMW X7 Electric Running Board

3. Our Service

We provide professional installation guidance services. The 2019 BMW X7 electric side step scooter is specially designed for special vehicles. No drilling is required during installation. The detailed installation information of the BMW X7 side step is as follows.

BMW X7 Electric Running Board

BMW X7 Electric Running BoardBMW X7 Electric Running BoardBMW X7 Electric Running Board

BMW X7 Electric Running Board

1.Professional pre-sales team responding quickly to your product consultation.
2.Professional service team answering various product questions for you.

BMW X7 Electric Running Board

1.The technical team with 10 years of installation experience handles various issues during the installation process.

2.Detailed installation instructions to make your installation easier and faster.

BMW X7 Electric Running Board

1.For contracted agents, the company gives competitive price support in the market.
2.For contracted agents, our company offers marketing promotion support.
3.Some countries in the world are still available now  to sign exclusive agents. For exclusive agents,  we offer market protection policies and assist them in marketing promotion, and all our customers in the corresponding region will be transfered to you and to be maintained by you. 
4. Factory Strength

Our company specializes in the production of automotive electric side steps, We have initially developed the BMW X7 electric side step.and we have applied for a number of Chinese and foreign appearance patents and practical patents. Exhibitions are the company's image window, our company has participated in Dubai, Thailand, France, UK and other exhibitions. You’re welcome to visit us anytime. With 10 years experience in design and production of electric side steps, we have a professional pre-sales and after-sales team, all for a better customer experience, to meet your high quality needs.

Certifications And Patents

BMW X7 Electric Running Board

 Exhibition Pictures

BMW X7 Electric Running Board

 Factory WorkshopBMW X7 Electric Running Board

BMW X7 Electric Running Board

5. Supplying Capacity

Our company has introduced domestic advanced assembly lines, providing service to domestic major automobile manufacturers like BYD Auto, Chery Automobile and Honda Acura Auto. Our company produces more than 300 models and is the largest manufacturer of the same products in China, covering most of the car models and model years . Professional packaging design guarantees the safe transportation of products, the logistics partners with many years experiences guarantee your delivery time, welcome to inquire us and we’re more than happy to serve you! 

Running boards Production

BMW X7 Electric Running Board

 Electric running boards Model table

BMW X7 Electric Running Board

BMW X7 Electric Running Board
6. FAQ

Q1: How about the packaging of 2019-2021 BMW X7 electric side step?

A: Generally speaking, we pack the goods in cartons, and we can also pack them according to your requirements. If you have a legally registered packing patent, we can package the item into your brand box after receiving your authorization.

Q2: What is your payment terms?
A: 30% deposit and 70% before delivery. We will show you photos of products and packaging
before you pay the balance.
Q3: What is your trading terms?
A: We use EXW, FOB, CIF and other trading terms.
Q4: What time can I order for 2019-2021 BMW X7 electric side step?
A: Generally speaking, shipping within 2-5 days after receiving the advance payment (within 50 sets). Please contact us for the delivery time of bulk orders. The exact delivery time depends on the quantity of your order.
Q5: Can you produce according to the sample?
A: Yes, we can produce it through your samples or technical drawings. We accept OEM and ODM orders.
Q6: What is the developing policy for new models?
A: If It is urgent to develop new models for the market, we charge the fees according to the order quantity and difficulty level. For details, please consult our staff.
Q7: Do you test all the goods before delivery?
A: Yes, we have 100% testing before delivery to ensure that all products are under perfect status before they are shipped.
Q8: How do you maintain a long-term and good relationship with us?
A: 1. We adhere to good quality and competitive prices to ensure the benefit of our customers;
    2. We regard each customer as our friend, we do business in good faith sincerely, make friends with customers, no matter where they come from.
    3. We always insist on helping our customers to sell products and grow together with us.

Send us your message.

Frist name(required)

Last name(required)

Company name

Email(required)

Phone numer(required)

Country(required)

Message (required)

If there are other documents that need to be sent to us, you can choose to send mail to us.

The Countries We Have Served

Vietnam U.A.E UK U.S.A Thailand Turkey Singapore Sweden South Africa Saudi Arabia Spain Russia Peru Philippines Poland Netherlands Malaysia Mexico Korea Japan Indonesia Israel India Italy Hungray Germany French Polynesia France Costa Rica Canada Brazil Argentina Australia